Cookie Consent by Privacy Policies Generator website Assembly instructions for fencing Art WPC Bamboo

Fencing assembly instructions

1 Fencing spacing

  • PRIVACY spacing with Wpc stand: 1520 mm
  • PRIVACY TREND spacing with aluminium stand: 1490 mm
  • EDO NON VEDO spacing with Wpc stand: 2050 mm
  • VEDO NON VEDO TREND spacing with aluminium stand: 2020 mm

2 Installing the Bolt down stands

piantana iniziale

Place the first stand on the base and mark the holes on the plinth or concrete part.

Fori con trapano

Drill holes.

Next stand

Place the galvanized stand and fasten it.

Misurazione

Measure the position of the next galvanized stand * (from post centre to post centre).

3 Installing the Drivable stands

For installation standard equipment is used, owned by every wood professional: saw, hammer, screwdriver, measuring tape and spirit level.

Insert stand

Insert the stand on the cement or in the holes made with the core drill.

Misurazione

Measure the position of the next galvanized stand * (from post centre to post centre).

4 Installing the posts

Insert the WPC posts on the stands.

Insert the WPC posts on the stands.

Installazione colonne

Do not install all the stands: proceed progressively to correct any calculation errors.

5 Installing the Privacy slats

IInsert the Privacy slats into the groove at the top of the WPC post.

If the spacing has been respected there will be 5 mm space left on both sides between the end of the slat and the posts, so as not to damage the structure in case of thermal expansion of the WPC Bamboo slats.

Insert the finishing slat last.

Privacy fencing advice

For fencing higher than 2000 mm, especially in windy areas: we recommend the insertion of a stainless-steel cable clamp in the inner channel of the slat, to further strengthen the hold of the fence and prevent the wind from breaking the slats.

Close the top of the stand with an end cap with screws or two-component epoxy glue.

Art WPC Bamboo does not supply this material

6 Installing the Vedo non vedo slats

Insert one reinforcing core for every slat.
Insert the slats with reinforcing core (20x10 mm cold galvanized) into the groove from the top of the WPC post.
If the spacing has been respected there will be 5 mm space left on both sides between the end of the slat and the posts, so as not to damage the structure in case of thermal expansion of the WPC Bamboo slats.

Insert the spacers between each slat into the channel of the post from above.

Close the top of the post with an end cap with screws or two-component epoxy glue.