Cladding assembly instructions

1 Classic and Professional Cladding assembly instruction - horizontal slats

Install the aluminium joists on a smooth surface. Keep the distances as in the drawing.

Install the aluminium joists on a smooth surface. Keep the distances as in the drawing.

After having fastened the joists, use code AF602 start clip to fasten the first slat, then continue the installation using code AF601 clip.

After having fastened the joists, use code AF602 start clip to fasten the first slat, then continue the installation using code AF601 clip.

Horizontal detail with clip..

Horizontal detail with clip..

Measurements that must be respected for the warranty to be valid.

Measurements that must be respected for the warranty to be valid.

Thermal expansion

Surrounding temperature (°C) Example of slat length to be installed
and mm of gap to be maintained only on the longitudinal side (heads) of the slats
°C Example of slat length to be installed
m.l. 1.00 m.l. 1.50 m.l. 2.00 m.l. 2.50 m.l. 3.00
Dimension in mm of the longitudinal gap between the slats (heads)
10 2,70 4,10 5,40 6,50 8,10
20 1,80 2,70 3,60 4,30 5,40
25 1,40 2,00 2,70 3,20 4,10
30 0,90 1,40 2,00 2,70 3,20
35 0,50 0,70 1,80 2,20 2,70

related to the temperature at the moment of installation

2 Classic and Professional Cladding assembly instruction - vertical slats

Install the aluminium joists on a smooth surface. Keep the distances as in the drawing.

Install the aluminium joists on a smooth surface. Keep the distances as in the drawing.

After having fastened the joists, use code AF602 start clip to fasten the first slat, then continue the installation using code AF601 clip.

After having fastened the joists, use code AF602 start clip to fasten the first slat, then continue the installation using code AF601 clip.

Vertical detail.

Vertical detail.

Measurements that must be respected for the warranty to be valid.

Measurements that must be respected for the warranty to be valid.

3 Professional Grecato Cladding assembly instruction

Fasten joists with a maximum spacing of 40 cm.

Fasten joists with a maximum spacing of 40 cm.

Install the starting angular profiles and the end one.

Install the starting angular profiles and the end one.

Start to install the cladding.

Start to install the cladding.

Continue installing up to the angular.

Continue installing up to the angular.

Fasten the aluminium support to fasten the last panel with screws.

Fasten the aluminium support to fasten the last panel with screws.

Cut the last slat to size and fasten with screws. The Wpc must be pre-drilled before fastening the screws.

Cut the last slat to size and fasten with screws. The Wpc must be pre-drilled before fastening the screws.

Cut the last slat to size and fasten with screws. The Wpc must be pre-drilled before fastening the screws.

Cut the last slat to size and fasten with screws. The Wpc must be pre-drilled before fastening the screws.

Installation completed.