Catalogue page

Cladding assembly instructions

1 Assembling slats vertically

Distanze da rispettare

Install the aluminum fixing strips in a smooth surface, respecting the distances as shown in the drawing.

After fixing the strips use code AF603 clips to fix the first slat, then continue the installation using always code AF603 clips.

Measurements must be respected for the guarantee validity: Fixing strip spacing between 300 and 400 mm Max

Vertical slats
Vertical installation
Vertical slats
Vertical installation
Vertical slats
Vertical installation
Vertical slats
Vertical installation
Vertical slats
Vertical installation
Inline Vertical slats: Measurements must be respected for the guarantee validity
Inline Vertical installation: Measurements must be respected for the guarantee validity.
Staggered vertical slats: Measurements must be respected for the guarantee validity
Staggered vertical installation: Measurements must be respected for the guarantee validity.

2 Assembling slats horizontally

Measurements must be respected for the guarantee validity: Fixing strip spacing between 300 and 400 mm Max

Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation
Horizontal installation detail with clips
Horizontal installation detail with clips
Inline Horizontal installation: Measurements must be respected for the guarantee validity
Inline Horizontal installation: Measurements must be respected for the guarantee validity.
Staggered Horizontal installation: Measurements must be respected for the guarantee validity
Staggered Horizontal installation: Measurements must be respected for the guarantee validity.